A, characteristic, characteristics
1, bear to whet a ping of the paper mold is the material of the ground that has the stronger art and special adornment requests, is a kind of immediately available high strength with special mineral bone anticipate, have no machine pigment and additives to bear to whet a ground of ping material.Its advantage is an easy construction and models once and uses expect long, construction fast, repair the convenience fades in color etc. not easily.Made up the whole of a plank brick again at the same time bad, uneven, loosen to move easily, usage the period short etc. shortage.
2, have to bear to whet with the mold a ping of the art paper of this finished product creation, antiskid, the anti- jelly, a dust, sweep easily, the high strength bears the impact, and color and styles to have the extensive selectivity, cost the low and green environmental protection etc. characteristics, is small way of park, city , the parking factory, park currently, ideal choice of the business and the cultural facilities realm.
Two, the grass-roots concrete construction request
1, the strength of the grass-roots should the ≥ C25, its sh of water compare possibly small and the foundation in can't imply the strong early.
2, concrete in the biggest crushed stones bone anticipates a path ≤ 30 mms are proper, and the foundation face the cement sand syrup layer that the layer must assist to anticipate a path ≤ 15 mm ≥ thickness ≥ 10 mms with the crushed stones bone.
3, the concrete collapse to fall the degree and should control in the 3-4 cms, the merchandise concrete collapse to fall the degree and should control in the 12-14 cms.
4, the crushed stones, plain soil foundation must was press by the machine press solid or the is solid.
5, the adoption template cent the camalig sprinkles to note the method, press a ground of set design height constitution template( take the steel mold as proper), and draw the template oil, the template width take 5-6 meters as proper, use the level instrument to at any time examine the template elevation, use an adjustment to the deviation.
6, the following concrete of 10 cms flaps the usage flat panel type to flap the machine of to flap the homework of , the 10 cms above concrete usage insert type flaps the machine homework of .
7, use long ( the steel should breadth in the template more than 0.3 meter) many times of heavier steel system to roll to press a ground of set again and again, do a set level.While rolling to press a ground of set, should in addition to the foreign body of the clean steel .At can't use the part of the steel homework, should adopt the sample product to pare off to make a set level.
8, after the concrete a set level complete, should carry on the water processing.

Three, the construction step
1, the surface of pulls the hair processing:In the concrete surface early front by hand the work sheet iron puts on the concrete surface cement sand syrup even to seek even and pull the hair surface.
2, the cloth bottom anticipate:The even cloth of is thin and thin in the concrete surface a the colorful powder bottom of layer anticipate, then by hand the work sheet iron accept even accept the light to keep go to no longer see the cement foundation dead color in its surface a layer again.
3, build the paper mold:Take to like to pick the plank to choose the good paper mold specification, arrange in the colorful powder bottom that the like before anticipating the early stage of expect of foundation is superficial.
4, cloth material of :Harden the even cloth of of the mold a ping of a paper material the provision dosage of 2/3 in the early stage of of concrete is superficial, treat to harden the material absorption water is smooth wet after by hand the work sheet iron accepts the light, need the certain stage of early , then carry on the second time 1/3 material cloths accept the light homework.
5, seek even, accept the light:According to the hardening circumstance of the concrete, practice at least three times handicraft sheet iron accepts the light homework, and accept light should mutually the interleave carry on.
6, tore down the paper mold:After accepting the light completion of work, summer 4-6 hours, winter 10-12 after hours, pull the paper mold.
7, carry out various design style, veins and colors.

Four, a ping protects and requests
1, harden the construction of a ping of the paper mold material to carry on outdoors generally, the construction temperature should be above 2 ℃s.
2, harden a ping of the paper mold material at start construction to complete 3 divas to clean the surface dust and greasy dirts with the water or alkaline detergents, if use to clean and must wash one more time with the clear water at last and together. 3, treat to clean to harden a ground of ping material surface complete dry have no the of water at least for more than 1 day, the square can draw to brush the first protect, brush again after grade a time protect a stem the second protect with the increment strength and shining degrees, complete a ping of later art in addition to good adornment, its physics is also very stable.
4, if the construction complete hereafter meet the rainy day or strong sunlights, then must add the cover to defend rain to defend to bask the cloth of to give the protection in hardenning the paper mold ground.
5, a ping protect the stage and must prevent°from the personnel passing in and out or carrying on the construction operation of other items literally.

The paper mold construction diagram:


 
     
 
     
 

Art grounds        
Press mold
Pager mold
Sample product
Solid view
 
Customer's service hot-line:
0755-61150630 61150685
Fax:0755-61150685
24hour consults special line:
(0)13826507192
    点击这里给我发消息
Add:Treasure Anne District blessing of Shenzhen City always
longxiang north road No.29
Email:cy@bestlion.net
© Copyright to Shenzhen bestlion Chemical Co.,LTD
E-mail:cy@bestlion.net